متعدد المراحل الاكمال

أدوات المسرح

تثبيت أطواق الأسمنت لإكمال الآبار أحادية التجويف

Cemented-back monobore well construction reduces total wellbore costs by cementing the vertical and build sections of a well from the heel back to surface with a stage tool, rather than running intermediate casing. This technique also eliminates trips required in traditional operations of removing the running string and installing the fracture string.

Packers Plus offers a range of field-proven stage tools that are specially designed to reduce operational risk and improve efficiency.

A rendering of Packers Plus' solutions flow control and sand management sleeve.

مزايا

  • Reduced wellbore construction costs by eliminating intermediate casing
  • SF Cementor® and SF Cementor D stage tools lower risk of lost stages with integrated secondary closure sleeve that provides no loss of diameter
  • Degradable stage tool options eliminate time and cost of clean-out operations

فيديو مميز

فيديو مميز

أدوات المسرح

Default Image

ابدأ المحادثة

تحدث مع خبير تقني

كل مشروع مختلف. تحدث مع أحد خبرائنا لاستكشاف أفضل نهج لاحتياجاتك واكتشاف كيف يمكننا مساعدتك في تحقيق نتائج أفضل.

اتصل بنا