Multi-Stage Completions

Refrac / Re-Entry

Maximize production from mature assets with targeted stimulation

Packers Plus engineers completion solutions to help operators maximize asset production, including downhole tools for refracturing, re-entry and well recovery operations. With both permanent systems and retrievable tools, Packers Plus has the solution to improve operational efficiency in a variety of applications and wellbore requirements.

A rendering of Packers Plus' solutions multi stage completions components.

Advantages

  • Increase production from previously produced reservoirs
  • Continuous rigless pumping operation reduces completion time and cost
  • Custom stimulation for each stage of a previously completed wellbore
  • Reduce dependency on integrity of existing casing

Feature Video

Feature Video

StackFRAC Slimhole System

Default Image

Start the Conversation

Chat with a technical expert

Every project is different. Talk with one of our specialists to explore the best approach for your needs and discover how we can help you achieve better results.

Contact Us