Multi-Stage Completions
Pressure-Testable Toe Subs
Hydraulically Activated Tools for Cemented Liner Completions
The Toe-XT Testable Hydraulic Sleeve, Toe-AP Hydraulic Sleeve and Wet Shoe Sub lower the operational risk associated with coiled tubing runs for the first stage of cemented liner completion systems. These technologies are cost-effective and operationally flexible, helping customers save time and reduce risk when establishing communication with the reservoir post-cementing and prior to stimulation operations.

Advantages
- Reliable hydraulic activation for consistent fracture initiation
- Eliminates the need for wireline intervention
- Simplifies completion operations and reduces equipment requirements
- Saves time and reduces overall completion costs
Suite of Toe Subs
- The Toe-XT Testable Hydraulic Sleeve allows the casing string to be pressure tested a single time before opening.
- The Toe-AP Hydraulic Sleeve opens at a specific absolute pressure, saving time and cost in delivering an effective treatment of the first stage.
- The Wet Shoe Sub provides a reliable hydraulic flow path for cementing operations while enabling efficient wellbore preparation and toe-stage initiation.
Start the Conversation
Chat with a technical expert
Every project is different. Talk with one of our specialists to explore the best approach for your needs and discover how we can help you achieve better results.