Liner Hanger & Stage Tools
Trex Cemented Liner Packer
Continuous pumping operations to improve operational efficiency
Packers Plus multi-stage completion systems are designed for open hole and cased hole stimulation in unconventional formations, providing operators with an efficient and cost-effective method to complete their wells. These innovative, field-proven systems allow for exact placement of stimulation treatments in one continuous pumping operation, reducing operational time and cost. Once stimulation operations are complete, a well can be immediately flowed back and put on production.
Contact us for a Quote
Advantages
- TREX Cemented Liner Packer reduces time and fluid usage with setting ball retained in running tool during setting operations
- Reduced risk with ability to rotate, push and pull in highly deviated wells
- Improved operations with an element design that allows for higher circulation rates and run in hole speeds
- Unique anti-release mechanism prevents liner disconnect while running in hole or circulating
Feature Video
Feature Video
Stackfrac HD
Feature Video
Feature Video
Stackfrac HD-X